01638 555010|info@evogreen.co.uk

St Helena School

  • September 17, 2014

St Helena School

St Helena School have installed a total of 98.25kWp Solar PV array on their roofs.

The Background

St Helena School is a secondary school located in the centre of Colchester in north Essex, and is rated by Ofsted as a Good with capacity for 1,000 students. St Helena specialises in media studies. The School site is steeped in roman history, within its playing field the remains of an ancient roman temple have been discovered and excavations have produced many roman artefacts.

It was self-evident that the decision to install a solar PV system would not only address the issue of the increasing cost of energy but also demonstrate the School’s commitment to being a sustainable organisation within the community. The purpose of the project was more than just an exercise in cost savings. The benefits went beyond cost providing a tangible link for students learning and understanding concerning the importance of sustainability. St Helena School was not able to commit the funds to an outright purchase of the solar PV system, so the decision was taken to lease the equipment.

 St Helena School

 

The Installation

  •  98.25kWp solar PV array
  • Q-CELL 250 polycrystalline Solar Panels
  • SMA 3-Phase Inverters
  • Sunny Webbox Monitoring System

Benefits

  • Annual output of 85,727 kWh
  • Reduced energy costs of £469,685 over the project lifespan
  • 763 tonne reduction in CO2 emissions over the project lifespan
  • Revenue generated from the FiT £229,539 over the project lifespan

 

St Helena School

 

 

Testimonial

“Evogreen’s passion for the products and services they provide is at the core of everything they do. They advised us through every stage of the project, they were professional, confident in the quality of the systems they design – understanding the needs of the School. The installation took place over a two week period during the summer break.  The project management of the installation was excellent.  The project was completed to schedule with minimal disruption.  The caliber of the team installing the system was professional.” – Sarah Caven-Atack – Director Finanace and Admin