Kingsmoor Lower School have installed a Powerstar 114 kVA Voltage Optimisation unit.

The Background

Kingsmoor School is a Community School in Bedfordshire which seeks to develop each child’s academic performance and social skills through delivering a differentiated curriculum and employing highly trained staff. The Governing Body felt that having already installed Solar PV as a renewable energy source it would be beneficial to install a Voltage Optimisation unit, this would help reduce their electricity bills further and also prolong the life of their electrical equipment.

Kingsmoor Lower School

The Installation

  • Powerstar 114 kVA Voltage Optimisation unit

Benefits

  • Savings of £111,512 on electricity usage over the project lifespan
  • 322 tones of CO2 emissions avoided of the
    project lifetime.